Project Lentera Pagan Gaharu
Located in Desa Ketitang Kabupaten Grobogan, Central Java, Lentera Pagan Gaharu is formed to retest, repair and repaint 3-kg LPG containers in support of the National energy conversion program from …
Located in Desa Ketitang Kabupaten Grobogan, Central Java, Lentera Pagan Gaharu is formed to retest, repair and repaint 3-kg LPG containers in support of the National energy conversion program from …
Supervision, verification and certification of EPC, and offshore pipeline installation and testing for 135 km gas pipeline.
Supervision, Verification, and Certification of EPC, and offshore pipeline installation and testing for 656 km gas pipeline.
We distribute and trade nafta (condensate), the side product of DSLNG (Donggi Senoro, Luwuk – Sulawesi Tengah), to petrochemical plant
CPP Gundih consist of process units, utility units, and custody meter including the last handover point of side products. Its main responsibility is to maintain and protect 8 flow lines starting …
Empora Gaharu was founded in 2012 as a management, asset handling, and property development company. Hotel Arra is the property landmark of Empora Gaharu which established to support the operation …
Titis Sampurna Inspection has been consistently acting as a pioneer in extending the expertise of Indonesian industry by delivering close attention to efficiency, safety, and quality of oil and gas …
The facility was built in 2007 and has been operating since 2008. The CNG facility optimizes the use of used-to-be neglected flared gas and now is producing a more economical …
SPP is a special purpose vehicle built to run the 140 km Gas Transmission System project from Gundih, Cepu to Tambak Lorong Power Plant in Semarang, Central Java. SPP purchases …
In order to maximize the benefit of the natural gas utilization, Titis Sampurna includes in its design to build a Liquid Petroleum Gas (LPG) Extraction Plant as part of the …